Junction of the Long Path with the AT. South 50 miles to the Long Path's southern terminus at the George Washington Bridge.
Long Path south junction with Phoenicia-East Branch Trail.
Curtis-Ormsbee Connector (the Long Path) junction with Wittenberg-Cornell-Slide Trail.